Luban Hotel
RVI has been commissioned to design the interior concept for Luban Hotel, a prominent local Omani hospitality brand in Muscat,…
Show moreHotels, resorts, restaurants and lounges built to perform commercially and endure operationally, with interiors that give each destination a character of its own.
8 projectsRVI has been commissioned to design the interior concept for Luban Hotel, a prominent local Omani hospitality brand in Muscat,…
Show more
RVI was commissioned to deliver the architectural and interior design concept for Desert Rose Camp, a premium desert resort in…
Show moreRVI was approached to design the renovation concept for the Park Inn Hotel in Salalah, Oman, including hotel public areas and…
Show moreRVI has been commissioned to design a tropical jungle resort in Ubud, Bali, consisting of 55 luxury villas, a signature…
Show moreRVI was commissioned to design the interior architecture for the Maldives Beach Resort, an upscale 5,000 sqm beachfront…
Show moreRVI was appointed to design the PDO Executive Lounge in Muscat, Oman, creating a premium business hospitality environment for…
Show more
RVI was commissioned to design and build a private lounge area for a VVIP client in Muscat, Oman, featuring a tropical concept.…
Show moreRVI was commissioned to design a premium 24-villa resort community in the tranquil hills of Mae Rim, Chiang Mai. The masterplan…
Show moreHospitality work is built to an opening date that has usually been sold before the site is handed over. RVI holds design and construction under one contract so the programme has a single owner, and phases the work around the date the doors have to open.
| Stage | What RVI produces | Who signs it off |
|---|---|---|
| Concept design | Guest journey, zoning, F&B and public area concepts, mood boards and 3D visualisations | Client and operator |
| Detailed design | Guest room mock-up, FF&E schedules, kitchen and back-of-house coordination, lighting design | Client, operator and consultant |
| Authority submission | Permit set for Muscat Municipality, civil defence and municipality food-safety requirements | Authority and developer |
| Construction | Civil works, MEP first fix, kitchen and laundry services, ceilings, partitions, flooring | Site supervisor and consultant |
| Joinery and FF&E | Reception and bar joinery, guest room casegoods, loose furniture delivery and installation | Site supervisor |
| Handover | Commissioning, civil defence clearance, operator snag closure, O&M and as-built records | Client and operator |
Hospitality interiors are judged twice: once by the guest and once by the operator. Lobbies, guest rooms, restaurants and spa areas have to photograph well and still survive daily service, so material choices are made against wear, cleaning regimes and replacement cost as much as against the mood board.
The work spans guest room mock-ups, FF&E specification and procurement, back-of-house planning, kitchen and MEP coordination, and the joinery that carries the identity of the property. Phasing matters as much as detailing, because most of it is built around an opening date that is already in the market.
The parts of a hotel a guest never sees decide whether the parts they do see work. Housekeeping routes, linen and waste paths, kitchen extract, staff circulation and service lifts are planned at concept stage, because retrofitting them later means opening a ceiling that has already been finished.
The same discipline applies to finishes. A stone floor in a lobby has to take wheeled luggage, a restaurant banquette has to be re-upholstered without being rebuilt, and a corridor carpet has to be replaceable in sections. Those decisions cost nothing at design stage and a great deal afterwards.
A hospitality package from RVI typically includes:
RVI's hospitality work runs from the Luban Hotel and Park Inn in Oman to Desert Rose Camp in Bidiyah, a Maldives beach resort, a jungle resort in Ubud and a villa resort in Chiang Mai, alongside the PDO executive lounge and private dining venues. Each was delivered to an operator's standards while keeping the character that makes the destination worth travelling to.
A hotel's economics sit in the guest room. The same room is built dozens or hundreds of times, so every decision in it is multiplied: a joinery detail that takes an extra hour to install costs weeks across a floor count, and a finish that fails early has to be replaced everywhere at once.
That is why the mock-up room is built first and reviewed hard. Wardrobe and minibar joinery, bedside power and lighting controls, bathroom waterproofing and the junction between carpet and stone are all tested in reality. Once the operator, the client and our own team sign the mock-up, it becomes the standard the rollout is measured against.
A restaurant or bar carries more services per square metre than anything else in a hotel. Kitchen extract, grease management, gas, water treatment, cold rooms, acoustic separation from guest areas and a food-safety regime the municipality inspects all have to resolve inside a ceiling void that also has to look considered.
RVI coordinates the catering specialist, the MEP contractor and the interior into one set of drawings, so the extract duct is designed into the bulkhead rather than discovered by it. Front of house, the same discipline decides banquette depth, table spacing, lighting level and the acoustic treatment that lets a full room stay comfortable.
Most hospitality work is not a new build. It is a property that has to keep earning while it is improved, which makes phasing the design problem rather than an afterthought. Floors are released in sequence, hoarding separates guest routes from working ones, lift access is planned for materials and waste, and the loudest activity is scheduled around occupancy rather than around the trade.
Done properly, a guest staying during the works should notice a closed corridor and nothing else. RVI programmes refurbishment around that test, and prices the phasing openly rather than burying it in a rate.
Hospitality interiors do most of their work in the evening, which is when photographs are taken and when guests form their impression. Lighting is designed in layers and on scenes: a lobby that reads bright and efficient at check-in and warm at nine o'clock, a restaurant that lifts the food rather than the tablecloth, and corridors dim enough to feel restful without feeling unsafe.
Control is as important as fitting selection. Scene setting, dimming and zoning are specified so an operator can change the mood without changing lamps, and every fitting is chosen so it can be relamped or serviced by a maintenance team rather than a specialist.
An operator inherits whatever the project team specifies, and then lives with it for a decade. Cooling load, lighting efficiency, water fittings and the serviceability of equipment all land on an operating budget that nobody in the design meeting is responsible for.
RVI specifies with that second audience in mind: finishes that can be repaired in sections, joinery that can be re-veneered rather than replaced, fittings with parts available in the region, and services laid out so an access panel reaches them. It is less visible than a feature wall, and it is the part an operator thanks you for three years later.
The single most common reason a hospitality opening slips is not construction. It is an FF&E item ordered late. Case goods, loose furniture, decorative lighting, stone and specialist fabrics all carry manufacturing and shipping lead times measured in months, and no amount of site labour recovers a container that has not left.
RVI schedules procurement against the opening date from the moment the concept is approved, placing long-lead orders during detailed design rather than after it. Offices in Oman, China, Thailand and Tanzania mean much of that production can be supervised at source, with quality checked before shipping rather than discovered on arrival.
RVI works from a studio in Azaiba, Muscat, and delivers hospitality projects across the Sultanate, from city hotels and restaurants in Muscat and Salalah to desert and coastal properties such as Desert Rose Camp in Bidiyah.
Beyond Oman, offices in China, Thailand and Tanzania have supported resort work in the Maldives, Ubud and Chiang Mai. That reach is what lets a specification written in Muscat be manufactured, inspected and installed to the same standard on a site several time zones away.
Yes. Operator standards are treated as a specification and coordinated into the drawings from concept stage, with the mock-up room used as the point where operator, client and design all sign off the same thing.
Yes. Phased refurbishment is common for an operating hotel, with floors or outlets taken out of service in sequence, separation from guest areas maintained and noisy work scheduled around occupancy.
Yes. FF&E is specified, sourced, delivered and installed as part of the contract, supported by procurement teams in Oman, China, Thailand and Tanzania.
Back-of-house planning and the coordination of kitchen and laundry services sit within our scope, working alongside the specialist catering supplier so the services, extract and finishes resolve together.
A mock-up is one guest room built to final specification before the rest are started. It is where finishes, lighting, joinery and services are approved in reality rather than on paper, and it is the cheapest point at which to change your mind.
Yes. Standalone restaurants, cafes and lounges are a regular part of the portfolio, including Zen Restaurant at Avenues Mall and a Turkish restaurant and cafe in Muscat.
Yes. An outline FF&E budget is issued with the concept so the client can see the cost implication of a direction before detailed design begins, and it is refined as schedules develop.
Yes. Hospitality programmes are built backwards from the opening date, with the mock-up, long-lead FF&E, commissioning and operator handover all sequenced against it and reported weekly.
Yes. Spa, gym and pool areas are part of the hospitality scope, and they carry their own technical demands: humidity control, waterproofing, drainage falls, acoustic separation and finishes that survive wet use. They are designed alongside the rest of the property rather than handed to a separate specialist at the end.